PRODUCTS

Pre-Assembled Solar Systems

SolarSet Systems Are Delivered Fully Engineered & Ready To Use

OFF-GRID

An off-grid solar system has no connection to the utility grid. Solar panels charge a battery bank, and an inverter converts that stored power into standard 120 or 240 volt electricity. The system supplies the property entirely on its own, day and night. Off-grid is the configuration for sites the utility grid does not reach, or where running a new line is impractical.

HYBRID

A hybrid solar system connects to the utility grid and carries its own battery storage. Solar power runs the property first, surplus charges the batteries, and whatever is left goes out to the grid. Because the storage sits on site, a hybrid system keeps the property running through a power outage — the main practical difference from grid-tie.

GRID-TIE

A grid-tie solar system connects to the utility grid and has no batteries. The panels supply the property directly while the sun is up, and the grid covers the rest, which makes it the simplest of the three configurations to install. Grid-tie systems switch off during an outage, a safety requirement that protects the crews repairing the lines.

SPRING MOUNTAIN

SolarSet builds pre-assembled solar well pump systems for livestock wells and remote properties.

Document limit reached. You've reached your maximum limit of 7 viewed documents. Please contact SolarSet for more information.

Contact - Document Limit

View this document

Document Unlock

What these icons mean:

Small House/Cabin

Large Homes

Small Campers

Large Campers

RV’s

Small Construction Sites

Large Construction Sites

Telecommunications

Agricultural Operations

Well Pumps

FREE CURBSIDE DELIVERY WITHIN 300 ROAD MILES FROM OUR FACTORY

  • This service assumes delivery is made on an easily accessible driveway or parking lot directly connected to a well-maintained public road. Setting the unit in place and anchoring the system are additional services, available in select locations only, and will be priced on a case-by-case basis.
  • If unit is to be unloaded on public property, formal proof of permission from the Authority Having Jurisdiction is needed prior to arrival. 
  • The buyer, or a representative of the buyer, must be on-site to accept the system.

*Limitations Apply

Contact us for more information

719-759-5100
sales@solarset.com
46920 County Road E.
Center, CO. 81125